Dear guests, the Millstätter See bathhouse is open daily from 10:00 to 21:00. Reservations are not possible. We look forward to your visit!
Our next full moon sauna will take place on Monday 12.05.2025. We are open until 23:00; the last infusion takes place at 22:00. We look forward to seeing you there!

Diving tower - Millstatt lido

At home

Diving tower

Leap into the future

A landmark has been revived!

The diving tower at the Millstatt lido, which was built in 1930 and is a listed building, became a major attraction in the bathing experience at Lake Millstatt due to its formal and technical design.

The combination of diving platform and water slide was an absolute novelty at the time. The "looseness and playfulness" of the construction seems to breathe southern joie de vivre and is a unique phenomenon in today's otherwise very technoid bathing facilities - not only in Austria, but probably throughout Europe.

Almost 90 years old, built under the most difficult economic conditions, a landmark of architecture and stamp motif, it characterizes the image on the lake.

After a 10-year break, the monument was reopened to the public following extensive renovation work and has become the attraction it once was. The diving tower exerts a magical attraction on children and young people in particular. Countless highly emotional experiences and memories of tourists and locals alike surround the diving tower. The recommissioning and grand opening on August 2, 2019 will bring these stories back to life and turn the diving tower into a cult object that creates identity and promotes regional ties in a special way.

Structural measures

at the jump and slide tower 2019

  • Repair of the wooden piles to maintain stability and load-bearing safety
  • Concrete refurbishment: sandblasting, reprofiling, high-pressure cleaning, surface impregnation, hydrophobization
  • Revision and adaptation of all railing and staircase constructions to existing standards
  • Adaptation of the exterior railings
  • Demolition of the interior railings
  • Erection of interior net railings
  • Reworking the banisters
  • Renovation of the staircase substructure
  • Enclosure of the technology using metal grating
  • Installation of sliding doors with net railings at the jump platforms
  • Installation of stainless steel access and exit ladders
  • Installation of a water speed slide
  • Addition of a children's water slide
  • Installation of effect lighting

With support from the federal, state and European Union